Challenge

In mid-November, an operator in South Texas approached Razorback Direct for support with a high-priority well completion involving a complex fluid package that included HVFR, biocide, surfactant, and scale inhibitor. The project was initially slated for early January, but only days into preparation, the operator pushed the kickoff date to early December. This shift meant Razorback had just over two weeks to design, source, and deliver a comprehensive chemical package. The stakes were high, with the operator already over budget and tight deadlines on the line.

Razorback Direct's Approach

Razorback moved quickly, leveraging in-house expertise on South Texas formations to begin sourcing options immediately. Our team kept the operator informed at every step, refining options for each completion chemical and pulling water samples from the site for lab analysis. Within seven days, Razorback delivered a comprehensive data packet with performance results and tailored recommendations for each chemical. Working closely with our manufacturing partners, we were able to keep the total package under the operator’s projected AFE, despite the expedited timeline.

Timeline of Success

  • Day 1: Initial meeting with the operator to outline the project and Razorback’s approach.
  • Day 10: Operator announces an expedited start date.
  • Day 13: Razorback shares sourcing options for all chemicals.
  • Day 14: Water samples pulled for testing.
  • Day 22: Razorback delivers a full data packet to the operator.
  • Day 33: Completion of the well, with zero NPT and no safety incidents.
  • Day 37: Submission of FracFocus data for operator review.

Execution & Results

Despite the tight timeline, Razorback seamlessly integrated into the operator’s completion schedule, deploying an optimized fluid package in time for the new start date. Highlights included:

  • Efficient Delivery: A total fluids package, including HVFR options for field evaluation, deployed within a month of the initial meeting.
  • Onsite Quality Control: Real-time data collection on HVFR performance, daily water quality monitoring, and onsite QA/QC for each FR to ensure consistent results.
  • Zero NPT and No Safety Incidents: Razorback’s team met the operator’s expectations with zero non-productive time and a flawless safety record.
  • FracFocus Data Submission: Completed and submitted all FracFocus data within a week of project completion as added support for the operator.

Value Provided

Razorback Direct’s fast, coordinated approach enabled the operator to stay on track and within budget on a critical project:

  • Project Alignment with AFE: Collaborating with base manufacturers to deliver a cost-effective chemical package under budget.
  • Operational Efficiency: Streamlined operations with real-time data, consistent quality assurance, and dedicated onsite support.
  • Full Compliance and Reporting: Comprehensive FracFocus data submitted promptly post-completion, ensuring full transparency.

Through rapid response, real-time collaboration, and rigorous quality control, Razorback Direct demonstrated its ability to deliver safe, efficient, and budget-aligned solutions, underscoring our commitment to operational excellence in South Texas’s high-demand environment.

AdobeStock 1099857570 Preview

Partner with Partner with Razorback Direct

Ready to see how our solutions can work for your operations? Contact us today to discuss your project and explore opportunities to optimize your chemical programs.